ПАО «ТГК-1» представляет производственные показатели за 9 месяцев 2019 года
Electricity output of TGC-1, including PJSC Murmanskaya CHPP, for 9 month of 2019 comprised 20,363.6 million kWh, which is 5.5% lower than for the same period of 2018.
At the same time, the comparable electricity output at TGC-1 condensed heat power plants increased by 1.0%, which is due to market situation, as well as the need to ensure reliability of the power system in accordance with the load schedule of the power equipment upon the request of the System Operator of the United Power System.
The electricity output by HPPs decreased by 12.8% due to the lower water content in the regions where company operates throughout the reporting period.
TGC-1 electricity output summary (million kWh)
| 9M 2018 | 9M2019 | Difference |
---|---|---|---|
Nevsky branch | 13,244.8 | 12,613.2 | -4.8% |
Karelsky branch | 2,806.1 | 2,726.3 | -2.8% |
Kolsky branch | 5,494.4 | 5,014.2 | -8.7% |
TGC-1 total | 21,545.4 | 20,353.7 | -5.5% |
PJSC Murmanskaya CHPP | 9.7 | 9.9 | +2.1% |
TGC-1 total, including | 21,555.1 | 20,363.6 | -5.5% |
The volume of heat output from collectors of TGC-1, including PJSC Murmanskaya CHPP, comprised 16,046.5 thousand Gcal, which is 2.4% lower than for the same period in 2018 due to unusually warm weather conditions in the first quarter of 2019.
TGC-1 heat output summary (thousand Gcal)
| 9M 2018 | 9M2019 | Difference |
---|---|---|---|
Nevsky branch | 12,873.6 | 12,491.9 | -3.0% |
Karelsky branch | 1,181.9 | 1,122.7 | -5.0% |
Kolsky branch | 962.9 | 1,015.8 | 5.5% |
TGC-1 total | 15,018.4 | 14,630.4 | -2.6% |
PJSC Murmanskaya CHPP | 1,416.3 | 1,416.1 | 0.0% |
TGC-1 total, including | 16,434.7 | 16,046.5 | -2.4% |
For more information about the results of the company’s production performance, please visit the Reports section of the corporate website.
About
TGC-1 (part of Gazprom Energoholding Group) is a leading producer and supplier of electricity and heat in the North-West of Russia. TGC-1 comprises 53 power plants within four constituent entities of the Russian Federation: St. Petersburg, the Republic of Karelia, and Leningrad and Murmansk Oblasts.
TGC-1's installed electric capacity is 6.95 GW, and heat capacity is 13.75 thousand Gcal/h. Major Shareholders: Gazprom Energoholding LLC (51.79%) and Fortum Power and Heat Oy (29.45%).